# How to Get a Building Permit, Step by Step

> Check whether your project needs a permit and what zoning allows, then prepare plans and apply to your city or county building department, usually online. Reviewers check the plans and may ask for changes. Once the permit is issued, you post it, call for inspections at each stage and pass a final inspection to close it.

Source page: https://opencityrecord.org/guides/building-permits/how-to-get-a-building-permit/  
Topic: Building Permits & Inspections  
Updated: 2026-10-31  
Reviewed by: Casey Glade (2026-11-19)

## Key facts

- Under the model residential code, a permit becomes invalid if work doesn't start within 180 days of issue or if more than 180 days pass between inspections, unless the building official extends it.
- Cities issue permits inside city limits. Outside city limits, the county usually does, and electrical or plumbing work may need separate trade permits.
- Incomplete applications cause delays. Reviewers send comments back, and each round of corrections adds time.
- Some states set deadlines for permit review. Washington, for example, requires partial fee refunds when local governments miss permit timelines.

Here's how to get a building permit for most home projects. First, check whether you need one and what zoning allows. Then prepare plans and apply to your city's building department, or your county's if you live outside city limits. Reviewers check the plans and may ask for changes. Once the permit is issued, you post it at the site, call for inspections as the work goes, and pass a final inspection to close it. The steps below follow a typical order, with a checklist of what to bring.

![A sample building permit application with the owner, parcel number, scope of work, valuation, contractor license and attached plans, with notes on the parcel, the scope, the valuation and missing plans.](/guides-img/building-permits/how-to-get-a-building-permit-header.svg)
_A complete application is the fastest way through plan review\._

See this in your city: [find your city](https://opencityrecord.org/states).

## How do you get a building permit, step by step?

![Eight steps from checking the rules through plan review, permit issue, inspections and the final inspection, with who acts at each step.](/guides-img/building-permits/how-to-get-a-building-permit-steps.svg)
\*Plan review is often where the waiting happens. Inspections follow the work as it goes.

### 1. Find out whether you need a permit

Most work that adds space, changes the structure, or touches wiring, plumbing, gas or heating needs a permit. Small jobs like fences under 7 feet, small sheds and finish work often don't under the model code, but your city may differ. Our guide to [whether you need a building permit](/guides/building-permits/do-i-need-a-building-permit/) covers 13 common projects.

### 2. Find out who issues it

If you live inside city limits, the city's building department issues permits. Outside city limits, it's usually the county. Electrical, plumbing and mechanical work often needs separate trade permits. If you're not sure which side of the line you're on, the county's parcel map or the building department can tell you.

### 3. Check zoning before you design

Zoning decides where a project can go and how big it can be: setbacks, height, lot coverage and use. A plan that breaks a zoning rule will get stopped in review, so check first. Look up your district with our guide on [how to find the zoning of a property](/guides/zoning/how-to-find-zoning-of-a-property/). If you need an exception, you'll need a variance before the permit.

Also check for overlays and outside approvals. Historic districts, floodplains, septic systems, HOA rules and utility easements can each add a review or a separate sign-off.

### 4. Prepare your plans

What you need depends on the project. A water heater permit may need only a form. An addition needs real drawings. Here's what residential applications often ask for:

- **Application form** with the owner, address, parcel number and a clear description of the work
- **Site plan** showing the lot lines, existing buildings, the new work and its distance from each line (see [how to read a site plan](/guides/building-permits/how-to-read-a-site-plan/))
- **Floor plans** with room uses, sizes, doors and windows
- **Construction details** such as foundation, framing, roof and wall sections
- **Trade details** for electrical, plumbing and mechanical work, if a separate permit doesn't cover them
- **Energy forms** showing insulation and window ratings
- **Engineering** for beams, retaining walls or anything outside the code's standard tables
- **Contractor information**, including license numbers, if you're not doing the work yourself
- **Valuation**, the total cost of the work, which often sets the fee

If your city posts a checklist for your project type, download it and follow it line by line.

### 5. Apply and pay the review fee

Many cities now take applications through an online portal, and some still have a counter. In some cities you pay a plan review fee when you apply and the rest when the permit is issued. Our guide on how much a building permit costs explains how the fees add up.

### 6. Get through plan review

Reviewers from zoning, building and sometimes fire, engineering and utilities check your plans against the code. If something's missing or wrong, they send comments. You fix the plans and resubmit, and each round adds time.

Review times depend on staffing and volume. In Kansas City, Missouri, planning staff told the [Neighborhood Planning and Development Committee on Sept. 29, 2026](https://kansascity.myopenmissouri.org/meetings/bb8109b4-c61e-41bf-b642-5b49e839b93e) that review times were "still trending in the right direction" while permit volume was higher than in any of the last three years. Staff described added consultant help and a "concierge" step for applicants whose plans keep getting sent back. No vote was taken on the update.

Some states set deadlines for local review. Washington, for example, requires partial fee refunds when local governments miss permit timelines. At the [June 23, 2026 Metropolitan King County Council meeting](https://kingcounty.openwashington.org/meetings/105555b0-2c58-4a19-b84b-1902065a1b59), county permitting employees told the council during public comment that their team had worked to meet the new timelines, which carry partial refunds if missed. Check your state's law to see whether any deadline applies to you.

### 7. Pick up and post the permit

When review is done and fees are paid, the city issues the permit. Keep the permit card and the approved plans on site, as the model code requires. Inspectors check the work against those plans, not against a newer version on your laptop.

Mind the clock. Under section R105.5 of the model residential code, a permit expires if work doesn't start within 180 days of issue or if more than 180 days pass between inspections, unless the building official grants an extension.

### 8. Call for inspections

Inspections happen at set stages, and you ask for each one when the work is ready. A typical addition might get:

- **Footing or foundation**, before concrete is poured
- **Underground plumbing**, before it's buried
- **Framing**, with rough electrical, plumbing and mechanical, before walls are closed
- **Insulation**, before drywall
- **Final**, when the work is finished

Don't cover work that hasn't passed. If an inspector can't see it, you may be told to open the wall. Failed inspections usually mean a fix, a re-inspection and sometimes a fee.

### 9. Pass the final inspection and close the permit

The final inspection checks that the finished work matches the approved plans. When it passes, the permit is closed in the city's records. For a new home or some additions, the city also issues a [certificate of occupancy](/guides/building-permits/what-is-a-certificate-of-occupancy/) before anyone moves in. Keep your closed permit paperwork. Buyers, appraisers and insurers may ask for it later.

## How long does it take to get a building permit?

It depends on the project and the city. Some cities issue simple permits, like a water heater replacement, over the counter or online the same day. Plans for an addition, a new house or a commercial space take longer, and each round of comments adds time. Ask your building department for its current review times before you set a start date with a contractor.

## Can you pull a building permit yourself?

In many places, a homeowner can pull a permit for work on a home they own and live in. You take on responsibility for the work meeting code, and the inspections are the same. Some states and cities limit what owners can do themselves, especially trade work. In Geneva, Illinois, for example, an owner can do residential plumbing only if they also live in the home.

Cities also change what needs a permit at all. On Aug. 18, 2026, the [Rosenberg, Texas City Council](https://rosenberg.myopentexas.org/meetings/2026-08-18-city-council-regular-meeting-august-18-2026-fab55d70-9506-45b6-8904-fb1148ef2c69) voted 7-0 to update its fee schedule and drop permit requirements for minor electrical and non-gas plumbing repairs that homeowners do on existing homes, according to the meeting recording. Rules like that can change in a single vote, so [search recent meetings for building permit changes](/search?q=building+permit) in your own city.

## What are common reasons a permit gets delayed?

- **Missing documents.** The checklist exists for a reason. A missing site plan or energy form sends the file back.
- **Zoning problems.** A setback or height issue found in review can stop everything until you redesign or get a variance.
- **Unclear plans.** Reviewers can't approve what they can't read. Dimensions, labels and scale matter.
- **Wrong valuation.** If the city thinks your number is low, expect a question and a fee adjustment.
- **Unpaid fees or expired applications.** Some cities close applications that sit too long without a response.

## What if plan review turns down your plans?

A rejection in plan review is rarely the end. Comments often ask for a missing detail, a clearer drawing or a change to meet a code section. Under the model code, the building official has to give the reasons in writing. Answer each comment in writing, mark the changes on the revised sheets, and resubmit everything the reviewer asked for at once. Piecemeal answers tend to trigger another round.

If you disagree with a reviewer's reading of the code, ask for a meeting with the plans examiner or the building official. The model codes let the building official approve an alternative material or design that meets the intent of the code, so bring evidence such as an engineer's letter or a product listing.

If that fails, the model code sets up a board of appeals for building code decisions. It hears disputes about how the code was applied, and it can't waive the code. Zoning decisions go to a different body, often the board of adjustment, through a variance or an appeal of the zoning official's decision. Appeal deadlines can be short, so read your denial letter closely.

If you're buying a house, check its permit history too. Our guide on [how to look up permits on a property](/guides/building-permits/how-to-look-up-permits-on-a-property/) shows how. To see your council's recent votes on permit rules, [find your city](/states).

This is general information, not legal advice. Check your city's requirements and your state's law before you start work.

## Common questions

### How long does it take to get a building permit?

Simple permits like a water heater can be issued over the counter or online the same day in some cities. Plans for an addition or a new house take longer, and each round of reviewer comments adds time. Ask your building department for its current review times.

### Can a homeowner pull their own building permit?

In many places, yes, for a home you own and live in. You take on responsibility for the work meeting code and passing inspections. Some states and cities limit what owners can do themselves, especially trade work, so check your local rules.

### What documents do I need for a building permit?

Usually an application, a site plan showing the lot and the project, floor plans and construction details, and sometimes energy forms or engineering. Trade permits need their own details. Your building department's checklist for your project type is the final word.

### How long is a building permit good for?

Under section R105.5 of the model residential code, a permit expires if work doesn't start within 180 days of issue or if more than 180 days pass between inspections. The building official can grant extensions, and some cities set longer windows.

### What happens at the final inspection?

The inspector checks that the finished work matches the approved plans and the code. When it passes, the permit is closed. New homes and some additions also get a certificate of occupancy before anyone moves in.

## Sources

1. [2024 International Residential Code, Chapter 1: Scope and Administration](https://codes.iccsafe.org/content/IRC2024P1/chapter-1-scope-and-administration), International Code Council
2. [Building Valuation Data](https://www.iccsafe.org/products-and-services/i-codes/code-development-process/building-valuation-data/), International Code Council
3. [SB 5290 (2023): Local permit review](https://app.leg.wa.gov/billsummary?BillNumber=5290&Year=2023), Washington State Legislature
4. [RCW 36.70B.080: Development regulations, permit time periods and fee refunds](https://app.leg.wa.gov/RCW/default.aspx?cite=36.70B.080), Washington State Legislature
5. [G.S. 160D-405: Appeals of administrative decisions](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-405.html), North Carolina General Assembly
6. [Water heater replacement permit requirements](https://www.geneva.il.us/DocumentCenter/View/31), City of Geneva, Illinois
7. [Kansas City Neighborhood Planning and Development Committee, Sept. 29, 2026](https://kansascity.myopenmissouri.org/meetings/bb8109b4-c61e-41bf-b642-5b49e839b93e), OpenCity Record
8. [Metropolitan King County Council, June 23, 2026](https://kingcounty.openwashington.org/meetings/105555b0-2c58-4a19-b84b-1902065a1b59), OpenCity Record

Follow what your own city decides: https://opencityrecord.org/states