# How to Read a Site Plan (Annotated Example)

> To read a site plan, find the title block, north arrow and scale first. Then trace the property lines, locate the building footprint and check its distance to the setback lines. Finally, look for easements, utility lines, drainage arrows, the driveway and parking. The legend on the sheet explains each line and symbol.

Source page: https://opencityrecord.org/guides/building-permits/how-to-read-a-site-plan/  
Topic: Building Permits & Inspections  
Updated: 2026-10-31  
Reviewed by: Casey Glade (2026-11-19)

## Key facts

- At a scale of 1 inch = 20 feet, each inch on paper equals 240 inches on the ground, a ratio of 1:240. A line measuring 2.5 inches represents 50 feet.
- A bearing such as N 89°47′20″ E gives a property line's direction as an angle measured from north or south toward east or west, in degrees, minutes and seconds.
- Setback distances come from the zoning district, and a building that extends past a setback line usually needs a variance, often from a board of adjustment.
- Cities and counties set their own site plan rules, including the minimum drawing scale and whether a licensed surveyor or engineer must seal the plan.
- Large engineering projects are often reviewed at 30, 60 and 90 percent design before the final set is issued.

To read a site plan, start with the title block, the north arrow and the scale, then trace the property lines and their bearings. Next, find the building footprint and check its distance to the setback lines. Finally, look for easements, utility lines, drainage arrows, the driveway and parking, using the legend on the sheet to decode every line and symbol.

![Sample site plan sheet with notes on the title block, the north arrow and scale bar, the legend, and the property lines labeled with bearings and distances](/guides-img/building-permits/how-to-read-a-site-plan-header.svg)

_A site plan is an overhead map of a single lot, and every line, symbol and number on it carries a specific meaning._

See this in your city: [find your city](https://opencityrecord.org/states).

## What is a site plan?

A site plan is a drawing of a property seen from directly above. It shows the lot lines, the buildings that exist or are proposed, and how everything fits on the land, including setbacks, easements, utilities, drainage and parking. The model building code calls for a site plan with the construction documents for a permit, though the building official can waive it for alterations and repairs. They also ask for one with zoning applications such as variances, special use permits and rezonings, where neighbors and board members use it to judge the request.

It's easy to confuse a site plan with a few related documents, so check which one you're holding.

| Document   | Who usually prepares it                             | What it shows                                                                    |
| ---------- | --------------------------------------------------- | -------------------------------------------------------------------------------- |
| Survey     | Licensed land surveyor                              | What exists today: boundaries, corners, buildings, fences and recorded easements |
| Plat       | Surveyor or engineer, then recorded with the county | How a subdivision is divided into lots, blocks, streets and easements            |
| Site plan  | Designer, engineer or owner                         | What's proposed on one lot, often drawn on top of a survey                       |
| Floor plan | Architect or designer                               | The rooms inside a building, not the lot around it                               |

Some cities require a licensed surveyor or engineer to seal a residential site plan, while others accept a careful drawing from the owner. Spring Hill, Tennessee, for example, requires the plot plan for a new house to be signed and sealed by a licensed surveyor.

## How do you read a site plan, step by step?

Read the sheet in the same order every time, and even a busy drawing gets easier to follow. The numbers below match the callouts on the sample plan.

1. Start with the title block, which usually sits in a corner or along one edge of the sheet. It identifies the address or legal description, the person or firm that prepared the plan, the date, the revision number and the sheet number. Confirm that the date matches the version attached to the permit or the agenda.
2. Find the north arrow before deciding which side of the lot faces the street or a neighbor, because plans aren't always drawn with north pointing up.
3. Read the scale, which usually appears both as a written statement, such as 1 inch = 20 feet, and as a graphic scale bar. If the sheet was printed at a reduced size, rely on the scale bar, because the written scale is no longer accurate.
4. Trace the property lines, which are often the heaviest lines on the sheet. Check the legend for the line type. Each side is labeled with a bearing and a distance, and the corners may identify iron pins or other survey monuments.
5. Locate the setback lines, the dashed lines inside the property lines that mark the minimum distance a building must keep from the front, side and rear lot lines. The area inside them is where a building can go, and the required distances come from the zoning district.
6. Check the building footprint, which shows the dimensions of the house or building and its distance from each lot line. Many plans also list the finished floor elevation, labeled FFE. The model code requires the ground to slope away from the house, so the floor should sit above the surrounding ground.
7. Look for easements, which are strips, often hatched, labeled with a width and a purpose, such as a 10-foot utility easement. Building a permanent structure inside one may need the easement holder's permission, so ask before you design.
8. Follow the utility lines, which each receive a different line type and abbreviation, such as W for water and SS for sanitary sewer. Meters, cleanouts and utility poles usually appear as small symbols along those lines.
9. Follow the drainage: arrows show which direction water flows, swales are shallow channels that carry it, and spot elevations give ground heights at specific points. The model code requires the ground to fall at least 6 inches in the first 10 feet away from the house, and water should go to an approved collection point that doesn't create a hazard.
10. Check the driveway and parking, including the driveway width, its distance from the corner, the number of parking spaces and any sidewalk or curb cut. Some cities issue a separate permit for the driveway connection to the street.

![Annotated sample site plan of a 70-by-116-foot lot with ten numbered callouts in reading order: title block, north arrow, scale, property lines, setbacks, footprint, easement, utilities, drainage and driveway](/guides-img/building-permits/how-to-read-a-site-plan-annotated.svg)

_Read a site plan in this order: title block, north arrow, scale, lot lines, setbacks, footprint, easements, utilities, drainage, then parking._

## What does a 1"=20' scale mean?

A scale of 1"=20' means every inch on the drawing represents 20 feet of actual distance on the property. Because 20 feet equals 240 inches, the equivalent ratio is 1:240. To convert a measurement, multiply the number of inches by 20, so a line measuring 2.5 inches represents 50 feet and a building measuring 2 inches deep is 40 feet deep.

Site plans often use an engineer's scale. Each face of the ruler is labeled with the number of feet one inch represents, such as 10, 20, 30, 40, 50 or 60, and each inch on that face is split into the same number of marks. On the 20 face, each inch has 20 marks, so at 1 inch = 20 feet every mark stands for 1 foot. Floor plans use an architect's scale instead, such as 1/4 inch = 1 foot, so don't measure a floor plan with the 20 face of an engineer's ruler. Cities and counties also set limits on how small a plan can be drawn. Huntsville and Brenham, Texas both require residential site plans at a scale no smaller than 1 inch = 50 feet. Larimer County, Colorado sets its minimum at 1 inch = 20 feet, which calls for a larger, more detailed drawing. San Diego County, California requires a standard engineer's scale and tells applicants not to use an architect's scale.

![The 20 face of an engineer's scale, where a 2.5-inch line on the plan reads 50 feet, with the math: 2.5 × 20 = 50, and 1 inch equals 240 inches, a ratio of 1:240](/guides-img/building-permits/how-to-read-a-site-plan-scale.svg)

_At a scale of 1 inch = 20 feet, multiply the inches you measure on paper by 20 to calculate the distance in feet._

| Written scale | Ratio | 1 inch on paper equals |
| ------------- | ----- | ---------------------- |
| 1" = 10'      | 1:120 | 10 feet                |
| 1" = 20'      | 1:240 | 20 feet                |
| 1" = 30'      | 1:360 | 30 feet                |
| 1" = 40'      | 1:480 | 40 feet                |
| 1" = 50'      | 1:600 | 50 feet                |
| 1" = 60'      | 1:720 | 60 feet                |

## How do you read property line bearings?

A label such as N 89°47′20″ E 70.00′ describes the direction and length of one boundary. Picture yourself standing at the corner facing north, turning 89 degrees, 47 minutes and 20 seconds toward the east, and walking 70 feet along that line. Each degree contains 60 minutes and each minute contains 60 seconds, so 47 minutes and 20 seconds is a little less than one degree. In this style the angle is never more than 90 degrees, because it's measured from north or south toward east or west.

The opposite side of a rectangular lot carries the reverse bearing, such as S 89°47′20″ W. On an accurate survey, the boundaries close, meaning the final line ends exactly where the first one started. If the plan's dimensions don't match your deed or survey, raise the discrepancy before anyone pours concrete.

## What do site plan symbols and line types mean?

Engineering firms and cities draw symbols differently, so the legend on the sheet always takes priority. These are common conventions.

| Symbol or line      | What it usually looks like                 | What it means                                           |
| ------------------- | ------------------------------------------ | ------------------------------------------------------- |
| Property line       | Heavy line with long and short dashes      | The legal edge of the lot                               |
| Setback line        | Thin dashed line inside the lot            | Minimum distance a building must keep from the lot line |
| Easement            | Hatched or dashed strip with a width label | Land others may use for utilities, drainage or access   |
| Building footprint  | Solid outline, sometimes shaded            | Existing or proposed building, with dimensions          |
| Existing contour    | Thin dashed line with a number             | Current ground elevation                                |
| Proposed contour    | Solid line with a number                   | Ground elevation after grading                          |
| Spot elevation      | Small mark with a number, such as 512.8    | Height of the ground at that point                      |
| Drainage arrow      | Arrow on the ground surface                | Direction water flows                                   |
| Swale               | Dashed line with flow arrows               | Shallow channel that carries runoff                     |
| W, SS, G, E or OHE  | Line labeled with letters                  | Water, sanitary sewer, gas, electric, overhead electric |
| Cleanout or manhole | Small circle on a sewer line               | Access point to the line                                |
| Tree                | Circle, often with a center dot            | Tree to remain or, if crossed out, to be removed        |

## Where do you find the site plan for a property?

Start with the building department's permit file for the address, because permits for new construction or additions usually include a site plan. Our guide to [looking up permits on a property](/guides/building-permits/how-to-look-up-permits-on-a-property/) explains the online portals and records requests. Your closing papers may include a survey, and the county recorder or clerk keeps the recorded plat for the subdivision.

For projects that needed a public hearing, such as a variance, special use permit or rezoning, the site plan is often attached to the planning commission or council packet. Those packets are often posted with the agenda before the meeting, which often makes them the first public look at what a developer wants to build. [Search recent meetings for site plan reviews](/search?q=site+plan) to find the packets in your area.

See this in your city: [find your city](https://opencityrecord.org/states).

## What is 30/60/90% design?

The percentages are review milestones for engineering plans, often on public works such as roads and transit projects. A 30 percent set shows the basic layout, and a 60 percent set adds detailed design. A 90 percent set refines the last details before the final set is issued. Each agency defines exactly what every stage must contain.

For residents, the milestones matter because they show when comments can still change a project. The Metropolitan Council in the Twin Cities, for example, releases transit plans at 30, 60 and 90 percent for stakeholder and community feedback. By the 90 percent stage, it is asking only about refining details like lighting and landscaping.

## How do setbacks and easements play out at a hearing?

The numbers on a site plan often decide a variance case. On October 21, 2026, [the zoning board of adjustment in Richardson, Texas,](https://richardson.myopentexas.org/meetings/53d4eb8e-b440-48df-a920-6118a143b4d2) considered an owner's request to rebuild an aging detached garage on a lot developed in 1955. The new garage would sit 1 foot 8 inches from the side lot line instead of the required 3 feet. Moving the garage to meet the setback would have pushed it into an existing fence, a patio and a sanitary sewer easement. City staff recommended denial, finding no unique physical hardship, but the board voted 5-0 to approve, according to the meeting recording.

In Louisville, Kentucky, staff described a 450-square-foot carport already built onto a house at [the Board of Zoning Adjustment's Sept. 28, 2026, hearing](https://louisville.openkentucky.org/meetings/1b7b1107-ce76-4f56-be56-74e5de774b73). The carport sat about 1 foot from the side lot line, where the code requires 5 feet, so the owner needed a 4-foot variance. The owner said two contractors had said no building permit was needed. The board approved the variance 4-0. You can [search recent meetings for setback variances](/search?q=setback+variance) to see how your city's board handles cases like these.

- **Richardson, TX, Zoning Board of Adjustment, 2026-10-21.** Approved 5-0. Allowed a rebuilt detached garage 1 foot 8 inches from the side lot line instead of 3 feet, after staff recommended denial. Moving it would have hit a fence, a patio and a sewer easement. (From the meeting recording; minutes not yet published.) [Meeting record](https://richardson.myopentexas.org/meetings/53d4eb8e-b440-48df-a920-6118a143b4d2)
- **Louisville, KY, Board of Zoning Adjustment, 2026-09-28.** Approved 4-0. Approved a 4-foot side setback variance for a 450-square-foot carport already built about 1 foot from the property line. (From the meeting recording; minutes not yet published.) [Meeting record](https://louisville.openkentucky.org/meetings/1b7b1107-ce76-4f56-be56-74e5de774b73)
- **Las Vegas, NV, Planning Commission, 2026-05-12.** Approved 7-0. Approved a variance for a proposed shed that did not meet setback and separation standards, though staff found no hardship to justify it. (From the meeting recording; minutes not yet published.) [Meeting record](https://lasvegas.myopennevada.org/meetings/6f477507-7f3a-4f27-bd16-a7001b34b4ec)

This is general information, not legal or tax advice. Site plan requirements, scales and setback rules vary by state, city and zoning district, so check with your local building or planning department before you draw or sign anything.

## Common questions

### What does a 1"=20' scale mean?

One inch on the drawing stands for 20 feet on the ground. Because 20 feet is 240 inches, the ratio is 1:240. Multiply any measurement in inches by 20 to get feet, so a 2.5-inch line represents 50 feet.

### What is 30/60/90% design?

They're review milestones for engineering plans on larger projects. A 30 percent set shows the basic layout, a 60 percent set adds detail, and a 90 percent set refines the last details before the final set goes out. Each agency defines what every stage must include.

### What's the difference between a site plan and a survey?

A survey, prepared by a licensed land surveyor, records what exists: boundaries, corners, buildings and easements. A site plan shows what someone proposes to build, and it is often drawn on top of a survey.

### What do dashed lines mean on a site plan?

They often mark something other than a built edge, such as setback lines, easements, existing contours, underground utilities or items to be removed. The sheet's legend says which.

### Where can I find the site plan for my property?

Check the permit file at your city's building department, the survey in your closing papers, the recorded plat at the county recorder or clerk, and planning commission packets if the project needed a hearing. You can also file a public records request.

## Sources

1. [Residential Site Plan Requirements](https://www.huntsvilletx.gov/DocumentCenter/View/23912), City of Huntsville, Texas
2. [Residential Plan Review Checklist](https://docs.cityofbrenham.org/Departments/development/building/Residential-Plan-Review-Checklist.pdf), City of Brenham, Texas
3. [Residential Construction Permit Checklist](https://springhilltn.org/DocumentCenter/View/16894/Residential-Construction-Permit-Checklist), City of Spring Hill, Tennessee
4. [Residential Plot Plans](https://www.larimer.gov/building/codes/plot-plans), Larimer County, Colorado
5. [Plot Plan Requirements (PDS 090)](https://www.sandiegocounty.gov/pds/docs/pds090.pdf), County of San Diego, California
6. [Common questions: What's in a 30% design?](https://metrocouncil.org/News-Events/Transportation/Newsletters/30-percent-design.aspx), Metropolitan Council (Minnesota)
7. [2024 International Residential Code, Chapter 1: Scope and Administration](https://codes.iccsafe.org/content/IRC2024P1/chapter-1-scope-and-administration), International Code Council
8. [2024 International Residential Code, Chapter 4: Foundations](https://codes.iccsafe.org/content/IRC2024P1/chapter-4-foundations), International Code Council
9. [G.S. 160D-705: Quasi-judicial zoning decisions](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-705.html), North Carolina General Assembly