About 122,244 matching passages for “setback” · 80 cities queried
Some cities didn't answer, so these results may be incomplete.
Page 11 of 37
Showing the 740 most relevant meetings. Narrow by state, city, or meeting type to surface the rest.
Searched the 80 largest of 2261 cities. Pick a state or city to include smaller ones.
The ten-foot setback from the edge of the roof provision under Article 86.
Open meeting →
reduced building setback line from 40 feet to 5 feet along long road for again a proposed 288 unit apartment
Open meeting →+1 more mention in this meeting
Due to the setback, I don't think you have an insurance claim against me.
Open meeting →
The north side yard setback for a requirement of 10 ft.
Open meeting →+2 more mentions in this meeting
Stand consistent with the setback of the house to the north.
Open meeting →
The rear setback would so you would lose the right-of-way dedication plus the 25 ft.
Open meeting →+5 more mentions in this meeting
While the setback reduction is to zero, the location of the sign is approximately 15 feet back from the edge of payment, ensuring that standard site triangle is still maintained.
Open meeting →+1 more mention in this meeting
As far as a setback, there is there is a little bit of setback being presented right now at the site where there will there will be opportunity to print some bo bushes and some greenery.
Open meeting →+1 more mention in this meeting
The current 500 feet setback was not written for industrial facilities whose noise carries over a mile and has real documented health impacts on the people in the wildlife nearing living near them.
Open meeting →
the front yard setback area there's that uh shed that's built and it doesn't meet our aesthetic
Open meeting →+1 more mention in this meeting
But but the side setback are 20 is 20 ft.
Open meeting →
So although the front setback may vary based upon where the location would be, we do intend to align this building consistent with the modal setbacks for that section of Heat Street.
Open meeting →
Location front yard setback requirements 42 ".
Open meeting →
It's a temporary setback.
Open meeting →
They also note some setback conditions, so they have increased setbacks for rear and side setbacks along the rezoning area.
Open meeting →+7 more mentions in this meeting
A 24-foot setback is approximately 34 feet between the structure and the street curb, a separation that includes fencing and landscaping, so impacts to visibility, public safety, or the streetscape are minimal.
Open meeting →+3 more mentions in this meeting
So you have a setback, and then that upper story step back to really decrease that.
Open meeting →+4 more mentions in this meeting
They have an increased setback.
Open meeting →+1 more mention in this meeting
We have the rear setback violation.
Open meeting →+3 more mentions in this meeting
The upper story setback above 27 feet is 15 feet for the rear and 25 feet for the side.
Open meeting →+3 more mentions in this meeting