About 122,244 matching passages for “setback” · 80 cities queried
Some cities didn't answer, so these results may be incomplete.
Page 2 of 37
Showing the 740 most relevant meetings. Narrow by state, city, or meeting type to surface the rest.
Searched the 80 largest of 2232 cities. Pick a state or city to include smaller ones.
setback
Open meeting →+6 more mentions in this meeting
setback.
Open meeting →+1 more mention in this meeting
setback.
Open meeting →
setback
Open meeting →+1 more mention in this meeting
setback even on the other corner you heard me fair enough i i'm giving you an option if you want to postpone it for two months but i really but i don't think we're gonna change our minds but but that i can't speak for the board until the only thing i would ask if we were to hold the case is to look at another spot for that generator but if there's a spot if there's a if there's a path well you heard miss davis she suggested several times where to put it i i understand that but i still have a 40 feet front yard and i also have a ten
Open meeting →+5 more mentions in this meeting
Setback is 12 " from the rear roof edge and 16 " from the shared property line, which exceeds that which is required by the zoning code in terms of dimensional requirements.
Open meeting →
setback so that the stairs can uh face the street which allows for safer egress and better in interaction
Open meeting →+1 more mention in this meeting
setback to the property line, but there's a maximum that the overhang can be.
Open meeting →+1 more mention in this meeting
setback here, but then again, it's, I mean, to our best of knowledge, it's not
Open meeting →+6 more mentions in this meeting
setback from the rear and side yard with a detailed district development plan with binding elements.
Open meeting →
setback um this shows the whole community the waiver for the front yard setback is only being
Open meeting →+1 more mention in this meeting
setback and what looks like happening to me is that the developers just doing whatever the heck they want
Open meeting →+10 more mentions in this meeting
setback is is something that i i have concerns about um and so that that's kind of where i am
Open meeting →+9 more mentions in this meeting
setback that actually applies we're asking for it to apply to all the lots but it only applies to one
Open meeting →
setback requirement there he's looking we love we love planning on the spot but i think i appreciate
Open meeting →+5 more mentions in this meeting
setback adequate to, uh, make the compatibility finding between the existing and proposed.
Open meeting →
setback to have the encroachment into the setback with this corner, we wouldn't have the fault criteria at all.
Open meeting →+1 more mention in this meeting
setback to 18 feet where 20 is required very minimal reduction and that only applies to lots 13 through 18
Open meeting →+1 more mention in this meeting
setback for the, or the reduction setback for the addition.
Open meeting →
setback area where such is not allowed and to allow two existing residential accessory
Open meeting →+3 more mentions in this meeting