About 122,244 matching passages for “setback” · 80 cities queried
Some cities didn't answer, so these results may be incomplete.
Page 9 of 37
Showing the 740 most relevant meetings. Narrow by state, city, or meeting type to surface the rest.
Searched the 80 largest of 2238 cities. Pick a state or city to include smaller ones.
And the ten-foot setback for institutions in the back of lots.
Open meeting →+12 more mentions in this meeting
The left side setback is compliant.
Open meeting →+3 more mentions in this meeting
and the 20-foot setback, and they're showing this parking at the front, which we have approved
Open meeting →
Max front setback is 5 ft.
Open meeting →
Although the requested setback is three free from the property line, the sign is approximately 20 feet back from the edge of payment.
Open meeting →+1 more mention in this meeting
Major yard side setback required from 25 down to ten.
Open meeting →+4 more mentions in this meeting
And there is a setback of 13 and a half feet from the sidewalk.
Open meeting →
The exact height setback openings of materials should be designed and approved based on the Jacksonville, Florida requirements and the properties, stormwater permit, controlled access points.
Open meeting →
There are some setback issues with where some of the or one specific building lies on the site, and without the PUD, there's no way for us to.
Open meeting →+4 more mentions in this meeting
The requested setback will leave approximately 27 feet of space between the back of curb and the proposed structure and will comply with the 15 by 15 visibility triangle.
Open meeting →+1 more mention in this meeting
On the side setback, yes.
Open meeting →+1 more mention in this meeting
A larger setback does not cure an indefensible premise.
Open meeting →+6 more mentions in this meeting
which the setback is more than 80 feet.
Open meeting →+1 more mention in this meeting
And without the setback, we're looking at a 6 feet 5 " from my house.
Open meeting →+1 more mention in this meeting
The maximum required setback is 80 ft.
Open meeting →+1 more mention in this meeting
The proposed setback adjustments are what allow the project to deliver improved open space and a better final building condition.
Open meeting →
The proposed setback is 25 feet uniform throughout all those.
Open meeting →+2 more mentions in this meeting
it enjoys a lovely setback from jerusalem avenue and any proposal that comes forward
Open meeting →+1 more mention in this meeting
The infill setback ranges from 12 feet to 21 feet, and the request is 50 feet for a variance of 29 feet.
Open meeting →+2 more mentions in this meeting
to achieve maximum setback from single-family residential homes in the area.
Open meeting →+4 more mentions in this meeting