About 9,490 matching passages for “groundwater” · 80 cities queried
Some cities didn't answer, so these results may be incomplete.
Page 12 of 13
Showing the 258 most relevant meetings. Narrow by state, city, or meeting type to surface the rest.
Searched the 80 largest of 2356 cities. Pick a state or city to include smaller ones.
The current proposed remediation measures include capping affected soils, prohibiting future residential use of the site, and prohibiting potable use of the groundwater.
Open meeting →
No, because if I had to, I should be so many more inches above, you know, the resting groundwater, and and I, and it needs to be bigger.
Open meeting →+1 more mention in this meeting
Some common themes, which were also noted this morning during econ, the econ committee included the need to protect water quality and quantity, prohibiting the use of groundwater for cooling systems, the need for advanced cooling techniques, concerns about the elec- the electricity grid, noise regulations, efficiency and backup energy standards, protection of the agricultural reserve, energy costs,
Open meeting →
So a lot of it will be permeable pavers, permeable concrete, trenching that allows the water to percolate and then disperse back into the groundwater.
Open meeting →
As you are aware, we're a public entity that spans multiple counties, and we provide public service in the realm of irrigation, flood control, and the management of groundwater through our drains, and it is noted that we do that through multiple.
Open meeting →
So the purpose of the recharge ditch is to pump your water in there, and then that goes into the groundwater table and keeps the ground, keeps the groundwater from being lowered in the wetlands.
Open meeting →
It's enduring one of the worst water supply care shortages in 50 years with officials warning of severe restrictions and a heavy reliance on groundwater and desalinating seawater.
Open meeting →
There are other folks who I work with who are, but my sense is it's could be a very expensive proposition to deal with, and there are there are areas where the city is focusing on PFOS, primarily in groundwater, but the surface water hasn't been a specific area of focus for now.
Open meeting →
So strategies were added to investigate possible historic contaminants, evaluate remediation options, and prioritize groundwater recharge in aquifer areas.
Open meeting →
Water's a concern, but obviously, if you have Deer Creek water, you always have that change between groundwater.
Open meeting →
Are we talking about percentages, average soil toxic toxicity index, dust suppression efficiency, groundwater protection rate, illegal dumping reoccurrence rate, brownfield to productive land conversion rate?
Open meeting →
If they have a closed landfill like the current ones, once they close, there's gonna be a thirty-year maintenance program that they'll have to follow, plus probably additional work with groundwater monitoring, you know, leech aid, collection, all kinds of things.
Open meeting →
Legislation intends to capitalize on the water and use reclaimed water as a potable water supply, quantifying it, adding reclaimed water directly into the potable water supply coupled with the simultaneous injection of reclaimed water directly into the groundwater supply, affecting destabilizing the integrity of our aquifer.
Open meeting →+1 more mention in this meeting
They reduce stormwater runoff and flooding and soil erosion, and they act as a water filtration system with their roots taking out pollutants, purifying groundwater.
Open meeting →
They take water out of the system and don't return the water to it, and then they also include our groundwater.
Open meeting →
Operationally, our team processed more than 1100 wastewater permits, reviewed over 2000 residential permits, maintained MS-4 stormwater compliance, launched a groundwater dashboard, and saved over 600,000 gallons of water through our conservation programs.
Open meeting →
The chief problem we're running into on this site is that our preliminary soil borings indicate the presence of perhaps not significantly high groundwater, but high enough that it would-- the PFM does not allow infiltrative methodologies.
Open meeting →
And four, we support the installation of stormwater management solutions addressing quantity and quality control measures that exceed the county minimum requirements to help recharge that groundwater and prevent further harm to Akateen Creek and Cameron Run, both our impaired waterways.
Open meeting →
The wastewater collection program, which are the sewers and the pump stations, has also increased from 156,000,000 to 187,000,000 or 20% increase to increase our focus on rainfall-derived infiltration inflow and groundwater infiltration into our network, as well as the basement backup issues that the general manager mentioned.
Open meeting →
The DSCs encountered on the project include large amounts of subsurface cobbles and boulders, higher than anticipated groundwater elevations, and unknown man-made buried objects such as abandoned concrete structures.
Open meeting →